Knightsbridge 4

Synergy completed a substantial M&E upgrade for a Listed property in Knightsbridge, along with refurbishment and amalgamation of 2 apartments. The works included the removal of a faulty heating system and new plantroom installation.

The new plantroom was located within the pavement vaults at the front of the property, with new distribution to the tenanted apartments. After lowering and waterproofing the vaults, new gas, water and electrical connections were installed as part of the upgrade.